At INVALL we contribute to improving the quality of water, do its sustainability procurement and devise optimal distribution systems. During the last 25 years, we have worked with different public agencies that have allowed us to specialize in this sector. Our main courses of action are:
High salinity industrial waste water Phisic-chemical pre-treatment
Biological Reactor with membrane clarifier (MBR) Engineering
Location: Tarragona (Spain)
Budget: € 40.000.000
Year: 2022
Domestic waste water
Biological reactor with sludge treatment line
Location: Tarragona (Spain)
Budget: € 15.000.000
Year: 2010
Domestic Waste Water Reusal Reverse osmosis technology
Location: Tarragona (Spain)
Budget: € 45.000.000
Year: 2011
New electrical turbine
Location: Spain
Budget: € 30.000.000
Year: 2019
Architectural design & utility engineering
Location: Málaga (Spain)
Budget: € 65.300.000
Year: 06/2023 – 03/2025
Adecuacy of the design to the current regulations and projects for the infraestructure facilities
Location: Les Gavarres (Spain)
Budget: € 11.000.000
Year: 03/2022 – 09/2024
Project Design and Site Supervision
Location: Lérida (Spain)
Budget: € 1.750.000
Year: 03/2022 – 04/2023
At INVALL we actively contribute to the sustainable development of the planet through our commitment and innovation in renewable energy, in addition to reducing the environmental impact, which represent a significant energy saving that can reduce costs and increase profitability for the company.
We also have a photovoltaic audit team in order to ensure optimal conditions of the facilities. This line include audits realized on photovoltaic systems for Alguaire and Ruda Valley.
In Invall we also performed audits for public lighting installations in order to reduce consumption and emissions in the city of Tarragona lighting
Project Design, Site Supervision and Commissioning
Location: Spain
Budget: € 600.000.000
Year: 07/2022 – 11/2024
Project Design, Site Supervision and Commissioning for the New photovoltaic power plant
Location: Teruel (Spain)
Budget: € 1.300.000
Year: 03/2022 – 09/2024
Project Design & Site Supervision
Location: Spain
Budget: € 100.000.000
Since: 10 Years
Project Design and Site Supervision
Location: Spain
Budget: € 12.000.000
Since: 2017
Project Design and Site Supervision
Location: Spain
Budget: € 28.000.000
Since: 2012
Project Management, Site Supervision & Project Design
Location: Madrid (Spain)
Budget: € 1.100.000
Since: 4 years
Project Design & Site Supervision
Location: Burgos (Spain)
Budget: € 5.000.000
Year: 06/2022 – 10/2023
Project Design & Site Supervision
Location: Tarragona (Spain)
Budget: € 19.000.000
Year: 06/2019 – 10/2021
Project Design & Site Supervision
Location: Tarragona (Spain)
Budget: € 15.000.000
Year: 06/2020 – 09/2021
Project Design & Site Supervision
Location: Spain
Budget: € 12.000.000
Year: 11/2022 – 06/2024
Project Design & Site Supervision
Location: Spain
Budget: € 36.000.000
Year: 06/2022 – 10/2023
Project Design & Site Supervision
Location: Spain
Budget: € 1.100.000
Year: 03/2022 – 08/2022
Project Design & Site Supervision
Location: Spain
Budget: € 36.000.000
Since: 4 Years
Project Management & Site Supervision
Location: Spain
Budget: € 18.000.000
Since: 4 Years
Project Design
Location: Portugal
Budget: € 2.150.000
Since: 2 Years